Live Opportunities
60
Data Freshness
Daily Sync
Top Segment
Works
Budget Range
5.9 Lakh - 2.0 Cr
Live Opportunities
Sorted by: Release Date (DESC)
Works
Maintenance of water supply system in Sattari Taluka Replacement of Existing 63mm PVC to 90mm PVC pipeline from Sateli to Bandirwada in V.P Sawarde.
CIRCLE I
NORTH GOA, GOA
12.0 Lakh
Ends - 22 Jul 2026
Works
Design Programming and implementation of customized automation ON OFF OF 5HP Submersible pump set for 2000Cum GLR at Bicholim Housing board colony along with installation of customized and automatized actuator-based valve of 250mm Dia. Inlet.
CIRCLE I
NORTH GOA, GOA
12.0 Lakh
Ends - 22 Jul 2026
Works
Urgent repair by polyurathane grouting of overhead backwash water tank of filter house 5000cum Sankhalim GLR and 5000cum Bicholim GLR at 40 MLD WTP at Podocem
CIRCLE I
NORTH GOA, GOA
6.0 Lakh
Ends - 22 Jul 2026
Works
Urgent installation of Galvalium roofing sheets over leaking electrical panel room and chlorination room and other civil works at 40MLD WTP at Podocem.
CIRCLE I
NORTH GOA, GOA
12.1 Lakh
Ends - 22 Jul 2026
Works
Maintenance of water supply system in bicholim Taluka-Urgent laying of 300mm DI conveying main and 150mm DI distribution pipeline from Usgao steel bridge to Bhamai Junction in Sankhali Constituency
CIRCLE I
NORTH GOA, GOA
48.7 Lakh
Ends - 22 Jul 2026
Works
Providing footbridge and supplying K.T. gates for Bandhara at Signewal in Dharbandora Taluka.
CIRCLE I
SOUTH GOA, GOA
13.8 Lakh
Ends - 23 Jul 2026
Works
Cleaning of aquatic weeds and clearing of waterway from Maad Bansai to Cuppamaddi, Odar in Curchorem Constituency, (2nd Call).
CIRCLE I
SOUTH GOA, GOA
23.8 Lakh
Ends - 23 Jul 2026
Works
Construction of RCC U drain from Ariyapalayam old Bridge to Culvert near Kannagi School junction in Villianur, Puducherry (from Ch 29/200 to Ch 29/790 in Northern Side and Ch 29/480 to Ch 29/790 in Southern side).
CIRCLE I
PONDICHERRY, PUDUCHERRY
1.2 Cr
Ends - 04 Aug 2026
Works
Construction of RCC centre median of cast Insitu type in NH45A Cuddalore road from Mittal Ispet Pvt ltd to Kirumampakkam Erikarai road (ch.49/900 to Ch.50/400), Puducherry
CIRCLE I
PONDICHERRY, PUDUCHERRY
47.5 Lakh
Ends - 04 Aug 2026
Works
Construction of RCC centre median of cast Insitu type in NH45A Cuddalore road from Ariyankuppam Round about to Ariyankuppam Police station in Puducherry
CIRCLE I
CUDDALORE, TAMIL NADU
46.6 Lakh
Ends - 04 Aug 2026
Works
Rectifying the water seepage by attending with water proofing by Epoxy injection grout and finishing with Micro concrete at LUS Subway along NH45A in Puducherry
CIRCLE I
PONDICHERRY, PUDUCHERRY
34.9 Lakh
Ends - 04 Aug 2026
Works
Improvement to the nallah by construction of protection walls to the eroded banks of nallah at Sonarbhat in Latambarcem Village of Bicholim Taluka
CIRCLE I
NORTH GOA, GOA
1.2 Cr
Ends - 28 Jul 2026
Works
Improvement to waterway by construction of protection wall near A. V. Jai Shriram Gosavardhan Kendra at Village Nanus VMC Valpoi in Sattari Taluka Sattari
CIRCLE I
NORTH GOA, GOA
2.0 Cr
Ends - 28 Jul 2026
Works
Improvement of the Katcha road for Vakhar Sal Lift irrigation scheme at Sal in Bicholim constituency
CIRCLE I
NORTH GOA, GOA
1.0 Cr
Ends - 28 Jul 2026
Works
Construction of flood protection wall to the nalla from Mohan Shirgaonkar house to Muslimwada at Bicholim in Bicholim Taluka.
CIRCLE I
NORTH GOA, GOA
1.8 Cr
Ends - 28 Jul 2026
Works
Improvement to the existing nallah from Ghagreshwar Temple, to Prakash kamat house, from Ch.24.00 mts to Ch.58.00 mts at Sinquerim in ward No.I, Candolim in Calangute Constituency.
CIRCLE I
NORTH GOA, GOA
20.8 Lakh
Ends - 27 Jul 2026
Works
Stabilization of hillslope by Construction of Protection wall behind the house of Mr. Pravin Redkar and others at Dmello waddo of V.P. Verla Canca in Siolim Constituency.
CIRCLE I
NORTH GOA, GOA
23.2 Lakh
Ends - 27 Jul 2026
Works
Construction of steps near bridge culvert at Sakharwal in Village Shiroda of Shiroda Constituency
CIRCLE I
SOUTH GOA, GOA
6.9 Lakh
Ends - 22 Jul 2026
Works
Construction of steps near Saklo Gotawada bandhara at Gotawada Betoda in Shiroda Constituency
CIRCLE I
SOUTH GOA, GOA
10.9 Lakh
Ends - 22 Jul 2026
Works
Construction of Open well at Chowkidar Chowki, Raichemol Mapa in Village Panchawadi of Shiroda Constituency
CIRCLE I
SOUTH GOA, GOA
5.9 Lakh
Ends - 22 Jul 2026
Major Public Organizations
Browse Other States
Expert Intelligence
Strategic Bidding Insights for
CIRCLE I Tenders
CIRCLE I currently has 60 active tender opportunities. Tenders are available across 3 states including Goa, Puducherry, Tamil Nadu. Browse the latest procurement notices, bid invitations, and contract opportunities from CIRCLE I to find opportunities matching your business.
Navigating procurement in this sector requires thorough documentation and adherence to stringent eligibility criteria. Most successful bidders in this category maintain updated vendor profiles and demonstrate strong logistical capabilities.
Actionable Tips
- 1Review the specific empanelment criteria for CIRCLE I.
- 2Track corrigendum updates diligently to avoid bid rejection.
- 3Maintain high-resolution digital copies of technical qualifications.
Frequently Asked Questions
QHow many live tenders are available in CIRCLE I Tenders?
Currently, there are over 60 live opportunities listed for CIRCLE I Tenders. Data is synchronized daily to maintain accuracy.
QWhat industries does CIRCLE I Tenders primarily procure for?
CIRCLE I Tenders frequently issues tenders for a wide range of goods and services. Current listings indicate active requirements across multiple sectors.
QWhat are the basic eligibility criteria?
Bidders typically need a valid GST registration, PAN card, and a Class 3 DSC. Experience in similar projects is often a mandatory technical requirement.